The Engineering Stakeholder Interview
Boxes and Arrows
JANUARY 7, 2013
Project Management for Stakeholder Interviews. Try to speak with engineering management as well as the design engineer(s), if such a role exists; it’s seldom a good idea to involve the entire engineering team at this point. If there are no design engineers, a system architect and GUI lead may be the best option for software expertise.
Let's personalize your content