The Engineering Stakeholder Interview
Boxes and Arrows
JANUARY 7, 2013
Project Management for Stakeholder Interviews. Try to speak with engineering management as well as the design engineer(s), if such a role exists; it’s seldom a good idea to involve the entire engineering team at this point. How large is the engineering team assigned to the project, and what are their skills?
Let's personalize your content